PLATFORM 2, WESTBOUND

DESCRIBE ONLINE

Overview

This is a separate platform along the south side of the station, between the tracks and the main car park. There is tactile paving along the edge of the platform.

The ticket office is about in the middle, whilst the steps to the bridge are towards the east end.

To Reach

There is level access from the ticket office.

From the car park, up steps to the ticket office, or platform 2

South of the ticket office, there’s a raised paved area surrounded by car park on three sides. There’s a railing along the south side and steps at each end. From the east, you go up six steps, going west. You pass a gap through to the platform before the wall of the ticket office. The door to the ticket office is on your right after a few metres.

From the west you go up five steps, going east. You pass a gap through to the platform before you reach the wall to the waiting room. Continue, beyond this to locate the door to the ticket office. The door is on your left, after a few metres.

There’s tactile paving at the top and bottom of these steps.

From the car park, via the ramp up to platform 2

The foot of the ramp is opposite the foot of the steps down west from outside the ticket office. Continue (west), passing billboards and railings on your right, turn left (south) then right (west), continue to the top of the slope. Turn right (180 degrees, east) and continue up the ramp then turn left (north) onto the platform.

From the bridge, via steps down to platform 2

You go down 15 steps, plus an additional small step to platform level. Continue beyond the end of the railings on your right before moving right onto the platform, the tactile paving beyond the foot of the steps indicates the start of the gap. You're behind the rear of the train.

From the West

  railings and tactile at end
post, six car stop
wire mesh fencing along south of platform
posts are outside the fence
posts now inside fence
station sign
four car stop
wooden fence starts
CCTV post
CCTV post
post, three car stop
4 seats
path to ramp
metal railings on right
departure screen
path towards steps
glass wall of waiting room
entrance
wall of ticket office
entrance, double doors from ticket office, rail to each side
litter bin
smart card validater, out of service until October 2009
billboard
blank door
blank door
end of building
gap to steps
mesh fence
CCTV post
2 x 4 seats
post
post
gap to stairs to bridge
wall
post
railings and tactile at end.

Back Links

DETAILED DESCRIPTION

CROY STATION

© 2009, Terry Robinson