PLATFORMS 5 AND 6

DESCRIBE ONLINE

General Information

The floor texture changes from tiles to concrete, about 10 metres south of the West Cornwall Pasty Co. kiosk. There's no tactile paving near either edge. Track 6 starts about six metres south of track 5.

Going South from the Concourse

  trolley point
box structure with intercoms
island begins to narrow
railings round stairwell, not for public use
box
name board
signal post, about 15 metres south of the stairwell
slope off end

Back Links

DETAILED DESCRIPTION

GLASGOW CENTRAL STATION

© 2004, Terry Robinson