THE NEW BRIDGE

DESCRIBE ONLINE

Overview

This bridge, near the south end of the station provides lift and stairs access between platforms.

There are therefore three lifts and three sets of steps.

There's tactile paving at the top and bottom of the steps, which have a hand rail to each side.

Layout

The bridge runs west from platform 1, via platforms 2 - 3, onto platform 4. From here, there is level access to platforms 5 - 7.

This is an open bridge with plank walls at each end.

Near (North) Side, from the East

  steps from platform 1, up 14 then 14 steps, going south
blank wall
steps from platforms 2 - 3, up 15 then 15 steps, going south. These steps are inline with platform 2, move southwest then west from platform 3
blank wall
lift 3 from platforms 4 - 7, call button to your right (east) of the door

Far (South) Side, from the East

  lift 1 from platform 1, call button to your right (west) of the door
blank wall
lift 2 from platforms 2 - 3, call button to your right (west) of the door
blank wall
steps from platforms 4 - 7

From the island between platforms 4 and 5, you go up 15 steps, going south. Turn left (180 degrees, north) then go up 15 steps, going north, onto the bridge.

Back Links

DETAILED DESCRIPTION

PERTH STATION

© 2014, Terry Robinson