PLATFORM 2

DESCRIBE ONLINE

Features on the Platform, from the East

  slope off end
open area with posts
a kerb denotes the edge of the platform, there are trees between this kerb and the metal railings along Station Road
bike shelter
railings continue, posts in middle of platform
billboards
building starts
bench
blank door
help point
waiting room
bench
coffee shop, plant pots either side of door, seating area within

Recess

West Wall

  chocolate Vending machine
soft drinks vending machine

North Wall

  timetables

East Side

  window of coffee shop

Continuing west along platform 2, Beyond the Recess

  ticket machine
entrance from Station Road
steps to bridge
2 blank doors
building ends, wooden fence plus Teddington sign and posts
slope off end

Back Links

DETAILED DESCRIPTION

TEDDINGTON STATION

© 2003, Terry Robinson