PLATFORM 3, THAMESLINK, SOUTHBOUND

DESCRIBE ONLINE

From the West End

  wall at end
long blank wall with pillars

Wall juts out south

East Wall

  blank door

Continuing North Wall

  blank wall

Wall retreats north

West Side

  blank

continuing North Wall

  railings round 3 pillars
low gate on wall which can close off stairs to west bridge

First Recess

West Side

  Five stairs descend southeast from west bridge

North Side

  billboard

East Side

  six steps ascending east onto platform 2

Continuing North Wall, Beyond the First Recess

  2 benches
pillar
2 benches

Second recess

West Side

  blank

North Side

  blank

East Side

  8 steps ascending east onto platform 2

Continuing North Wall, Beyond the Second Recess

  pillar with loud digital clock
bench

Third Recess

West Side

  blank

North Side

  blank

East Side

  8 steps ascending east to platform 2

Continuing North Wall, Beyond the Third Recess

  fire extinguisher
card phone
vending machine
pillar
bench
intercom

Front of train stops here, before east bridge. Railings jut part way across the effective east end of the platform.

Back Links

DETAILED DESCRIPTION

FARRINGDON STATION

© 2003 Terry Robinson